Master shower/bath tear-out is complete. Delivery of all fixtures and bathtub completed today as well.
Plumber comes Friday to re-route the shower and bath drain pipes and raise them up from the slab to the new height that will make the new tile level with the bathroom floor.
Next step will be raising shower and old tub floor with concrete from the slab to the same height as the of the bathroom floor.
Then comes hip walls, cement board, tile and grout. Last step will be replacing any drywall and texturing it to match the other walls..
Finally, we will get the bedroom re-painted.
Blew through my budget big-time.
Can't wait until it is done!