Robby
  • Robby
  • Herf-A-Holic Topic Starter
Sunday, February 23, 2003 1:26:00 PM
Not what you may have been expecting based on the subject 🙂 Slightly more than a small project, but worth it in the end.77900.jpg
Mr.Mean
Monday, February 24, 2003 7:27:00 AM
You're gonna keep the tile right?
rck_1
Monday, February 24, 2003 8:34:00 AM
Robby,

We want to see pics when its done!!!

smithbw
Monday, February 24, 2003 9:19:00 AM
Great approach building a humi 🙂

Don't tell anyone until it is done - LOL

Regards,

B

Robby
  • Robby
  • Herf-A-Holic Topic Starter
Monday, February 24, 2003 10:05:00 AM
Yeah, the tile floor stays, the shower "was" tile. I'm going to put a fiberglass unit in. It was funny the way the built the darn thing! The floor was a quarter inch lead skirt all the way around (136 lbs of it). With 2" of poured concrete and a layer of tile. On top of that was another 3 inches of poured concrete and a new layer of tile that matched the floor tile. It's a wonder it didn't crack the house in half! Fun fun fun, the joys of home ownership.
Lowman
Monday, February 24, 2003 10:19:00 AM
Robby,

When you purchase the fiberglass unit, make sure it is ones that comes in sections. The one piece units are usually used in new construction or major remodeling jobs. They are very hard to fit in replacement jobs. Most times when one piece units are used, they are set in place ane the room is finished around it.

Good luck with your project.

Low

Spiny Norman
Monday, February 24, 2003 10:21:00 AM
Certainly up to your neck in it!

RICKAMAVEN
Monday, February 24, 2003 10:21:00 AM
don't forget, measure twice, flush once.
Mr.Mean
Monday, February 24, 2003 10:38:00 AM
this should be titles "wierd places I go to smoke inside."
bud451
Monday, February 24, 2003 10:55:00 AM
Don't forget your eye protection...seriously.
BMW
  • BMW
  • Herf-A-Holic
Monday, February 24, 2003 2:46:00 PM
Be careful backing up after taking a leak, you could find your arse in a hole.

Barry

usahog
Monday, February 24, 2003 3:25:00 PM
Robby, Don't you find it hard to drive nails with that Hammer??

Lead? wow a house with that age... if you think that job is bad wait until you go to replace the front or rear door!! LMAO!!! get some extra lumber for that project!!!

btw you putting in a shower or shoring up to put in a Hot Tub??

I'm glad I'm not you!!!

Ditto what :Lowman said about the one piece kits... Older homes and one piece don't fit LoL...

Hog

E-Chick
Wednesday, February 26, 2003 9:35:00 AM
Looks like "A might as well" project to me...

If'n you don't know what that means, you will by the time you are through in a few months...

LOL!

Good luck!

Lowman
Wednesday, February 26, 2003 9:51:00 AM
You're soooooo right E... I used to work as a designer/salesman for a Kitchen and Bath Remodeling contractor. It's either all or nothing...

Horizontal pipes in floor dry out, hair, dirt, oils, etc. harden... Pipes never flow the same... replace pipes...

Don't forget the wonderboard in the shower area...

Tile floor needs a little touch up... ooops... need new tile floor.. break up old tile and cement, float new cement and retile floor...

While doing tile floor, debris goes down line for toilet... problem with fitting for toilet.. new lead bend...

Let's not even talk about the new 6 section recessed cast iron, radiator...

SORRY ROBBY....

Low

Just Bustin' chops... Hope all goes well

Robby
  • Robby
  • Herf-A-Holic Topic Starter
Wednesday, February 26, 2003 10:17:00 AM
"Horizontal pipes in floor dry out, hair, dirt, oils, etc. harden... Pipes never flow the same... replace pipes..."

ummm heheheh aaaa, he said hard.

E-Chick
Wednesday, February 26, 2003 10:30:00 AM
Totally LOL@Butthead!!!

Lowman, don't forget rewiring for the recessed lighting and new fart fan...

The new entry door and/or hardware...

The toilet could be updated...does it match the sink?

How 'bout a new toilet paper holder and towel racks???

Oh, and speaking of sink...new vanity and faucets...

Floorboards...

Drywall texture...

Paint and caulking...

Shower curtain vs enclosed or sliding glass doors...hmmm...

Flooring? Manmade vs natural...

Labor, sweat equity, dust, insanity, fights, dust, money, dust...did I mention dust?

You are in for it!

;)

Lowman
Wednesday, February 26, 2003 11:29:00 AM
I guess you "have been there, done that"... huh, E.

When I was in design/sales, we stressed that we had that all included in our price. We told the customer that if they received a price from another contractor that was much lower, THIS is where the contractors get their "add-ons" which jack up the price. We didn't hide it... we spelled everything out.

Low

PS... E... "fart fan"... not for you, I'm sure... :o)

E-Chick
Wednesday, February 26, 2003 4:10:00 PM
Me? Fart? NEVER!

Just ask Mike :^)

BTW Robby, you look MUCH too happy in this pic!

What gives?