Yeah. Not sure how I'm gonna proceed with this.
I do not want concrete in this size. It will look like a driveway behind the house. Not to mention cracking, and potential for drainage issues which is unacceptable in a swamp. I would make concessions for a stamped concrete pad and install an extra deep gravel base with drain tile to the empty lot. She doesn't want stamped, dyed, or polished concrete.
I also don't want to do a project of this size without some help. We argued a bit more about this until she said she knows more about landscaping than I do and is adamantly against paver bricks. Discussions are over. Either I get a bug up my ass and do it entirely myself or it doesn't happen.
I did offer up the kitchen again. She doesn't want to spend months in a construction zone. Which I reminded her I wanted her to pick out cabinets, countertops and flooring and stuff so it could all be here before I start. She reminded me that I'm lazy and it will still take a long time. I said you can help. That shut it down.
Guess the vacation period of getting along are over.
danmdevries wrote: