thanks all.
blade, i don't wanna overdo it with this stuff.
i just know some people like to see stuff like this, so i just like to toss 1 in here and there. keep on the lookout.
ei- this job had a $2300 price tag on it.
gan- this job absorbed about 55 hrs. there were lots of parts to prepare, along with the bag extensions to attach and mold. the hand striping alone took 10 hrs.
about an hr. was taken with the customer to plan the job, the rest is as i go.
moomba, i don't have a big facility, although i have done some work on boats. i am in wautoma, wi.
any questions, shoot an e-mail to [email protected]
blacky